KNAUF W21 PDF

ADIT. Adit, Tangent construction model (Sketchup). AMFIPANEL. Amfipanel 3D ( Sketchup). Amfipanel on furring (DWG) (PDF). BELGRAVIA. Knauf Gips KG denies any liability for applications outside of Germany as K .de Knauf Cubo Escape Tunnel (see Knauf System Data Sheet Wde). Wde – Knauf Metal Stud Partition – Single metal stud frame, double-layer cladding. Wde Wde Knauf Sanitär-Einbauteile sanitary built-ins.

Author: Zujinn Mizahn
Country: France
Language: English (Spanish)
Genre: Medical
Published (Last): 7 April 2004
Pages: 352
PDF File Size: 13.51 Mb
ePub File Size: 5.51 Mb
ISBN: 515-6-19575-741-2
Downloads: 87017
Price: Free* [*Free Regsitration Required]
Uploader: Zulabar

Stairs, Ramps, Handrails and Guards 9.

It is built on skids, meaning that there are no footings More information. Legend Insulation zone Blue text Air tightness barrier note: Duration of fire resistance specified Type of More information. These systems help satisfy the performance More information.

P02 Knayf partitions introduction C05 Specialist partitions Introduction Specialist partitions This section details specialist lightweight systems where high-security. They are only applicale for the specified products, system components, application rules, and construction details in connection with the specifications of the respective certificates and approvals.

Larger room widths possile on request.

RS PRO Potentiometer Knopf, Dial Typ , 7.2mm Knauf Durchmesser, schwarz, 6.35mm

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for More information. However, steel construction is seldom used and is traditionally More information. Other systems are available for specific uses. General 1 This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and.

  JOSEPH ROTH RADETZKY MARCH PDF

Lateral compression reinforcements EN An F90 Fireoard Ceiling A1 rated solely from elow when connected to fireresistant walls, even under wood joist ceilings, is assigned with the general uilding authority designation F90 A Proofs Knauf System D Review answers to common questions regarding the design and construction More information.

Background and Applications Brussels, February Dissemination of information workshop 1 Structural fire design Eurocode Requirements for the insulation layer insulation material, e. Diamant oards are used in all fields of interior works as cladding of premium drywall systems with enhanced requirements for sound ww21 and fire protection, and in case of special requirements on mechanical resistance, in rooms with moderately high humidity.

Room width of continuous room 3 m tale value 3 m from the tale aove 2x UA Room width of adjacent room 2. Lindab’s recommendations Mounting instruction Suspension of ventilation systems Lindab’s recommendations Content General Examples of suspension Lower requirements of bearing capacity Suspension without requirements of fire class More information.

Knauf Mineral Wool Foil Faced Pipe Insulation 22mm Bore 30mm Thick m Long

Standard metal C stud partitions. Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight. Coiling Counter Fire Doors. For configuration with fire protection see pages 34 and 35 Notes Washers: Application Recommendations Dimensioning Aids. Lindner undertakes major projects worldwide in all areas of interior fit-out, insulation More information.

  ARTOUR RAKHIMOV PDF

The index R is used to differentiate etween the calculation value and the test stand values.

Knauf Gips KG – Ausschreibungstexte zum Download

Long edge Front edge 1st oard layer 2nd oard layer Board width Long edge joints etween the oard layers must e staggered y a half oard width etween the furring channel profiles.

It is used in certain ground floor basement situations More information. B2 2x covering strip: Sie gelten nur ei Verwendung der angegeenen Produkte, Systemkomponenten, Anwendungsregeln und Konstruktionsdetails in Verindung mit den Vorgaen der auaufsichtlichen Nachweise.

Upgrading existing timber floor with new ceiling. Mark Cramer Inspection Services, Inc.

Knauf Mineral Wool Foil Faced Pipe Insulation 22mm Bore 30mm Thick 1.2m Long

Fireoard is used in drywall systems that provide specially optimized fire protection solutions. Unterdecken alleine freitragend in the Fire resistance folder German only.

Please refer to technical data below for respective More information.